The live video of launching ceremony at Tsuneishi Factory is going to stream from 4:30p.m. on June 13, 2016.

2016-06-08 08:00

TSUNEISHI SHIPBUILDING Co., Ltd. (head office: Fukuyama, Hiroshima, Japan) will provide a live video of its ship launching ceremony via the internet from 4:30p.m. on June 13, 2016.

The channel of USTREAM
http://www.ustream.tv/channel/Tsuneishi

※The hours are subject to change. Please check TSUNEISHI SHIPBUILDING’s website for details.
Tsuneishi Shipbuilding website
http://www.tsuneishi.co.jp/english/

TSUNEISHI SHIPBUILDING Co., Ltd. holds launching ceremony approximately every two months at the Tsuneishi Factory.

This ship is a KAMSARMAX bulk carrier (D/W 81,600 mt type bulk carrier) which we developed to be one of our major products alongside the TESS series. The name "KAMSARMAX" derives from the ship's length, which is the maximum possible for entry into the port of Kamsar in Guinea, West Africa. Kamsar is one of the world's principal ports for bauxite.

The ship has 7 cargo holds, with side-rolling type hatch covers for each. In addition, cargo hold hatchways are built at maximum width to improve the efficiency of loading and unloading. Grain crops, coal, and iron ore can all be loaded onto the ship. High density material such as iron ore can be loaded into alternating cargo holds, such as No.1, No.3, No.5, and No.7.

In addition, to reduce the fuel consumption, the energy-saving device, MT-FAST is installed at stern, and the engine with electronic control system is also adopted. In order to be more environment friendly, the fuel tank with double-hull, the ballast water management system, and the main engine certified NOx Emission Standards with Tier ⅲ are introduced.

The launching ceremony takes about 20 minutes. We hope that you will take this opportunity to watch the excitement of the launch of our ships, which are built by bringing together the best of the shipbuilding technologies that Japan has to offer.

■Ceremony Schedule(16:30〜16:50)
1.Opening Address
2.Flower Bouquet Presentation
3.National anthem and hoisting the National Flag
4.Naming
5.Cutting the Line Rice cake rolling

■About the ship launched this time
LBD (m) :About 229m × 32.26m × 20.00m
Deadweight :About 81,600mt 
Gross tonnage :About 43,400gt
Main engine :MAN-B&W 6S60ME-C8.2
Service speed :About 14.5knots
Class :Bulk Carrier
Horse power :9,660kW

■Inquiry about the visit of the launching ceremony
TSUNEISHI SHIPBUILDING Co., Ltd.
General Affaira Group General Affairs Dept
Head Office (Fukuyama) TEL: +81-84-987-1101

■ For inquiries regarding this matter, contact:
TSUNEISHI HOLDINGS CORPORATION
Marketing Communication Group
pr@tsuneishi.com
Head Office (Fukuyama) TEL: +81-84-987-4915
Tokyo Office TEL: +81-3-3264-7733

Photo of the launching ceremony
画像・ファイル一覧
NC動画生成サービス
Copyright 2006- SOCIALWIRE CO.,LTD. All rights reserved.